Skip to main content
Editing Step 41 —

Step Type:

Drag to rearrange

Install E0 TEMP (2 white wires in a 2 pin connector) connector in the location E0 TEMP position on the DUET board.

Install the HOT END FAN (1 purple wire in a 2 pin connector) connector in the FAN 2 position on the DUET board.

Install the LAYER FAN (1 orange wire in a 2 pin connector) connector in the FAN 0 position on the DUET board.

Install the LED (1 green wire in a 2 pin connector) connector in the Always On Fan position on the Duet board.

Install the PROBE Wires(red, blue, black and brown wires in a 4 pin connector) connector in the PROBE position on the Duet board.

Your contributions are licensed under the open source Creative Commons license.