Skip to main content
Editing Step 43 —

Step Type:

Drag to rearrange

Flip the printer back over and put it on a work surface. Team lifting may be required, as the printer is heavy.

Locate and install the metal ball joints. Each ball joint is installed onto the carriage with (2) 1/2" long #4 sheet metal screws and #4 washer.

Complete this operation for all 3 towers.

Your contributions are licensed under the open source Creative Commons license.