Changes to Step #3
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
+ | [title] Mesh Loom #1 |
---|---|
+ | [* 1] Pass the wires through one of the shorter lengths of mesh loom material. |
+ | [* 1] Tightly zip tie the bundle to hold everything in place. |
+ | [* 1] Run everything through the wider cable boot, covering the zip tie and connector. |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added