Changes to Step #46
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
[title] Fuse Preparation | |
+ | [* 9] NOTE: If you purchased a machine after 8/22/2018 you will not need to install the 5A or 15A fuses. You kit may not come with them, and will come with a blank side panel instead. The fuses are now built in to the Duet board. If this is the case, skip this step, we'll revisit this later in Step 50. |
[* 1] At this stage, pass the red 20awg wire from the hotend whip and the black 12awg wire from the Y tower through the frame panel between the Y and Z towers. We will return to this in a few steps. |