Skip to main content

Changes to Step #46

Edit by Caleb Fairres

Edit approved by Caleb Fairres

Before
After
Unchanged

Step Lines

[title] Fuse Preparation
+[* 9] NOTE: If you purchased a machine after 8/22/2018 you will not need to install the 5A or 15A fuses. You kit may not come with them, and will come with a blank side panel instead. The fuses are now built in to the Duet board. If this is the case, skip this step, we'll revisit this later in Step 50.
[* 1] At this stage, pass the red 20awg wire from the hotend whip and the black 12awg wire from the Y tower through the frame panel between the Y and Z towers. We will return to this in a few steps.