Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #41

Edit by Andy Oprisko

Edit approved by Andy Oprisko

Before
After
Unchanged

Step Lines

[title] Wire Connections / Locations
[* black] Install E0 TEMP (2 white wires in a 2 pin connector) connector in the location E0 TEMP position on the DUET board.
-[* black] Install the HOT END FAN (1 orange wire in a 2 pin connector) connector in the FAN 2 position on the DUET board.
+[* black] Install the HOT END FAN (1 purple wire in a 2 pin connector) connector in the FAN 2 position on the DUET board.
[* black] Install the LAYER FAN (1 orange wire in a 2 pin connector) connector in the FAN 0 position on the DUET board.
[* black] Install the LED (1 green wire in a 2 pin connector) connector in the Always On Fan position on the Duet board.
[* black] Install the PROBE Wires(red, blue, black and brown wires in a 4 pin connector) connector in the PROBE position on the Duet board.