Skip to main content

Changes to Step #34

Edit by SeeMeCNC

Edit approved by SeeMeCNC

Before
After
Unchanged

Step Lines

+[title] Routing Belts
+[* 1] Rotate the stepper motor to the position shown in the photo. This location will give you the most available range of motion for tightening the belts after they are installed.
+[* 1] Route the belt as shown in the diagram on step 16
+[* 9] Be sure that the belt is not routed on the outside of the frame or carriage pieces! This will prevent motion.
+[* 1] To thread the belt ends into the carriage, use a wire tie or the cut-off from a wire tie to guide the belt up into the belt slot.
+[* 1] After you have threaded the belt into the carriage pull the belt end tight - you want to pull all the slack out of the belt.
+[* 1] Install the second belt clamp
+[* 1] You can trim excess belt, but leave approximately 1" past the belt clip.
+[* 1] Complete the routing process for the remaining two towers.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added