Changes to Step #21
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
[title] Stuffing Wires in Towers | |
[* 1] Locate the (3) pieces of T-Slot, (2) white 26awg thermistor wires, and long (3) 12awg red/black wires. | |
[* 1] Label the towers X Y & Z | |
[* 1] The Z tower will get the red 12awg wire fed down the center hole. | |
- | [* 1] The |
- | [* 1] The |
+ | [* 1] The X tower will get a black 12awg wire fed down the center hole. |
+ | [* 1] The Y tower will get the two thermistor wires and a black 12awg wire fed down the center hole. On this tower it is easiest to feed the thermistor wires first and then chase them with the 12awg black wire. |