[title] Stuffing Wires in Towers
[* 1] Locate the (3) pieces of T-Slot, (2) white 26awg thermistor wires, and long (3) 12awg red/black wires.
[* 1] Label the towers X Y & Z
[* 1] The Z tower will get the red 12awg wire fed down the center hole.
-[* 1] The Y tower will get a black 12awg wire fed down the center hole.
-[* 1] The X tower will get the two thermistor wires and a black 12awg wire fed down the center hole. On this tower it is easiest to feed the thermistor wires first and then chase them with the 12awg black wire.
+[* 1] The X tower will get a black 12awg wire fed down the center hole.
+[* 1] The Y tower will get the two thermistor wires and a black 12awg wire fed down the center hole. On this tower it is easiest to feed the thermistor wires first and then chase them with the 12awg black wire.