Skip to main content

Changes to Step #10

Edit by SeeMeCNC

Edit approved by SeeMeCNC

Before
After
Unchanged

Step Lines

+[title] Base Tower Supports TIPS
+[* 1] Insert the 6-32 nylon lock nuts into the injection molded parts first. There will be 2 of these nuts inserted per injection molded piece.
+[* 1] Then install the 1/4-20 button head screws and T-SLOT nuts. Remember to only get the nut started on the screw.
+[* 1] Press the bearing / cover assembly (pre-assembled by SeeMeCNC) onto the posts inline with the 1/4-20 hardware (position shown).
+[* 1] The two halves will be fastened together with #4 x 1/2"screws.
+[* 1] Complete 3 identical assemblies.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added