Skip to main content

Changes to Step #48

Edit by geneb

Edit approved by geneb

Before
After
Unchanged

Step Lines

[title] Routing the Fan Leads
[* 1] Route the fan leads along the body of the fan and in between the two bosses (indicated with green arrows)
-[* 1] DO PULL SO TIGHT AS TO RIP THEM OFF THE FAN, but Pull the leads taught on the bottom side
+[* 1] DO NOT PULL SO TIGHT AS TO RIP THEM OFF THE FAN, but pull the leads taught on the bottom side
[* 1] Insert the remaining #4 x 3/8" sheet metal screws into the fan mounts.
[* 1] With the screws inserted you will need to flex the legs of the layer fan mount into place and start the screw into the hole. Do not fully tighten yet.
[* 10] Flexing the legs of the layer fan mount helps to pinch on the fan, locking it in place.
[* 1] After you have all the layer fans attached and partially tightened, work on fully tightening one fan mount at a time. As you work toward having these fully tightened, ensure that the wires are routing correctly and have not moved from their expected potion.