Skip to main content

Changes to Step #31

Edit by Matthew Connor

Edit declined by SeeMeCNC

Before
After
Unchanged

Step Lines

[title] Confirm Correct Alignment / Tighten
-[* 1] Confirm the correct alignment of the HE280 Hotend PCB Board with the rest of the hot end assembly.
-[* 1] Once confirmed, fully tighten the EZR Struder / Hot End PTC Adapter
+[* 1] Double-check the correct alignment of the HE280 Hotend PCB Board with the rest of the hot end assembly as mentioned in the previous step.
+[* 1] Once confirmed, fully tighten the EZR Struder / Hot End PTC Adapter.