Changes to Step #22
Edit by Matthew Connor —
Edit declined by SeeMeCNC
- Before
- After
- Unchanged
Step Lines
[title] Preparing the High Temp Insulated Wire | |
- | [* 1] Locate the other Non-Insulated Wire Ferrule (26222) and the High Temp Fiberglass Insulated Wire (26192) |
+ | [* 1] Locate the other Non-Insulated Wire Ferrule (26222) and the High Temp Fiberglass Insulated Wire (26192). |
[* 1] Strip 10mm of insulation from one end of the High Temp Fiberglass Insulated Wire and 6mm from the other end. | |
[* 1] Slide the wire ferrule over the end of the lead on the heater cartridge. |