Skip to main content

Changes to Step #22

Edit by Matthew Connor

Edit declined by SeeMeCNC

Before
After
Unchanged

Step Lines

[title] Preparing the High Temp Insulated Wire
-[* 1] Locate the other Non-Insulated Wire Ferrule (26222) and the High Temp Fiberglass Insulated Wire (26192)
+[* 1] Locate the other Non-Insulated Wire Ferrule (26222) and the High Temp Fiberglass Insulated Wire (26192).
[* 1] Strip 10mm of insulation from one end of the High Temp Fiberglass Insulated Wire and 6mm from the other end.
[* 1] Slide the wire ferrule over the end of the lead on the heater cartridge.