Skip to main content

Changes to Step #12

Edit by SeeMeCNC

Edit approved by SeeMeCNC

Before
After
Unchanged

Step Lines

[title] Preparing the Heat Sink / Break
-[* 1] Locate the HE280 Heat Break - Stainless Steel and the HE280 Heat Sink
-[* 1] Screw the heat break into the heat sink.
+[* 1] Locate the HE280 Heat Break and test fit the 4mm PTFE tubing. The tube should insert and fully seat.
+[* 1] Screw the heat break into the heat sink. The heat sink is symmetrical, so either end is OK.
[* 1] Fully tighten the heat break using an 8mm or 5/16 wrench.