Changes to Step #7
Edit by Matthew Connor —
Edit declined by SeeMeCNC
- Before
- After
- Unchanged
Step Lines
[title] Securing the Mesh Loom | |
[* 1] Slide the mesh loom down on the wires so it is approximately 5mm from the Pluggable 8 position Push-In Wire Terminal Plug. | |
[* 1] Attach a Wire Tie (26164) over the mesh loom. Secure the wire tie approximately 10mm from the end of the Pluggable 8 position Push-In Wire Terminal Plug. Tighten securely. | |
- | [* 1] Slide the heat shrink tubing over the wire tie and Pluggable 8 position Push-In Wire Terminal Plug as shown in the |
+ | [* 1] Slide the heat shrink tubing over the wire tie and Pluggable 8 position Push-In Wire Terminal Plug as shown in the picture. Apply heat to the heat shrink tube to secure it in place. Use your preferred instrument. (If using an open flame such as a lighter, be sure not to hold the flame too long in one spot, as this will char the heat shrink tube.) |