Changes to Step #35
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
+ | [title] Bottom Installation |
---|---|
+ | [* 1] Route the Z tower wires through the opening in the Z tower location on the bottom assembly. |
+ | [* 1] Make sure all wires are in the channel without pinching, as you did when installing the top wires. |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added