Skip to main content

Changes to Step #48

Edit by Caleb Fairres

Edit approved by Caleb Fairres

Before
After
Unchanged

Step Lines

+[title] Installing the Bowden Tube
+[* 1] The Bowden Tube is the clear tube that delivers the filament from the extruder (EZR Struder) to the hot end (SE300).
+[* 1] Bunch the mesh loom up approximately 100mm from the top of the extruder and insert the Bowden Tube.
+[* 1] Push the Bowden Tube through the whip until you feel it 25-50mm from the "Y" in the whip.
+[* 1] Bunch the mesh loom up near where you feel the Bowden Tube and push the tube out through the loom.
+[* 9] Contrary to the second photo, do not insert the Bowden Tube into the hot end yet.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added