Skip to main content

Changes to Step #43

Edit by Caleb Fairres

Edit approved by Caleb Fairres

Before
After
Unchanged

Step Lines

+[title] Installing Ball Joints
+[* 1] Flip the printer back over and put it on a work surface. Team lifting may be required, as the printer is heavy.
+[* 1] Locate and install the metal ball joints. Each ball joint is installed onto the carriage with (2) 1/2" long #4 sheet metal screws and #4 washer.
+[* 1] Complete this operation for all 3 towers.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added