Changes to this Step
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
+ | [title] Wire Connections - Z Tower |
---|---|
+ | [* 1] We will now turn our attention to the Z tower wires. |
+ | [* 1] Choose the heated bed connections to the solid state relay based on date of delivery: |
+ | [* 10] Machines delivered after March 19th, 2018, have a BROWN 18AWG wire (see picture with red arrow) without connector. Install this in position #1 of the solid state relay |
+ | [* 10] Machines before March 19th, 2018, have a BLACK 18AWG wire without a connector. Install this in position #1 on the solid state relay. |
+ | [* 11] You can lift off the clear cover on the solid state relay to make it easier to install the wires. BE SURE TO PUT IT BACK IN PLACE WHEN YOU ARE DONE! |
Image 1
No previous image
Added
Image 2
No previous image
Added