Changes to this Step
Edit by Caleb Fairres —
Edit approved by Caleb Fairres
- Before
- After
- Unchanged
Step Lines
+ | [title] Wire Connections X Tower |
---|---|
+ | [* 9] FOR THIS STEP, THE DUET HAS BEEN REMOVED FROM THE MACHINE FOR CLARITY! DO NOT REMOVE THE DUET BOARD FROM YOUR MACHINE! |
+ | [* 1] Install the extruder stepper motor connector in the location indicated by a blue arrow in the image. **** Machines AFTER 3/20/2018: Motors can have a black connector and different color wiring, They are connected with the smooth side of the plug towards the side of the Duet shown in picture 3 **** |
+ | [* 1] Install E0 TEMP (2 white wires in a 2 pin connector) connector in the location E0 TEMP position on the DUET board (labeled with an orange arrow). |
+ | [* 1] Install the HOT END FAN (1 orange wire in a 2 pin connector) connector in the FAN 2 position on the DUET board (labeled with a yellow arrow). ****Recent machines will have this wire as PURPLE, not a orange as to differentiate between the two fan wires. Also shown in picture 3.**** |
+ | [* 1] Install the LAYER FAN (1 orange wire in a 2 pin connector) connector in the FAN 0 position on the DUET board (labeled with a black arrow). |
+ | [* 1] Install the LED (1 green wire in a 2 pin connector) connector in the Always On Fan position on the Duet board (labeled with a green arrow) This can also be in the position next to it, as shown in photo 3, either plug will work. |
+ | [* 1] Bunch up the wires labeled "PROBE" and tame them in the wire clamp. These are not currently used and are for possible future expansion. You can push the clamp closed now. |
+ | [* 9] FOR THIS STEP, THE DUET HAS BEEN REMOVED FROM THE MACHINE FOR CLARITY! DO NOT REMOVE THE DUET BOARD FROM YOUR MACHINE! |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added