Skip to main content

Changes to Step #13

Edit by Caleb Fairres

Edit approved by Caleb Fairres

Before
After
Unchanged

Step Lines

+[title] Preparing to Install Towers
+[* 1] We will now begin to prepare the top of the machine to install the towers.
+[* 9] ***IF YOUR ARTEMIS 300 HAS SCREWS HOLDING THE TOP OR BOTTOM DO NOT USE ANY POWER TOOLS! USE ONLY A SCREWDRIVER!***
+[* 1] If screws are holding the top on, carefully remove them with a screwdriver. Alternately your top could be secured with plastic rivets and is held together for shipping with shrink wrap.
+[* 1] There is a fan installed on the cover. Current machines have this connector already installed. If not, it will need a connector installed on the leads. You will use a 2 pin KK connector. Install the red wire in PIN 1 and the black wire in PIN 2.
+[* 1] You can now set the cover aside.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added