Skip to main content

Site Navigation

Your Account

Choose Language

Help

Step Type:

Drag to rearrange

Now install the black 12awg wire from the Z tower, and the red 12awg wire from the Y tower in the locations indicated here.

In the same Plug install the Positive and Negative leads from the 40mm cooling fan under the Duet Board. (SEE PICTURE)

You can cut these wires to whatever length you would like, just make sure they are not too tight or straining the Duet Connector.

Make sure the green terminal block DOES NOT twist, it could rip off and cause you to replace your entire Duet! You may need to CAREFULLY hold it with pliers while tightening the screw.

Your contributions are licensed under the open source Creative Commons license.