Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 45 —

Step Type:

Drag to rearrange

The bowden tube gets installed approximately 90mm from the end of the hot end whip. Measure from the end of the 8 position pluggable connector.

You want to insert the bowden tube into the mesh loom on the same side of the connector that has the beveled edges. This is noted in the picture with red makers.

Your contributions are licensed under the open source Creative Commons license.