Skip to main content

Site Navigation

Your Account

Choose Language

Help
Editing Step 86 —

Step Type:

Drag to rearrange

Orient the base as shown in Pic 1. The front of the machine is in the lower portion of this picture.

Place the heated bed on the PEEK insulators lining up the holes on the heat spreader with the holes on the PEEK insulators as shown in Pic 2.

Your contributions are licensed under the open source Creative Commons license.