Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #36

Edit by Andrew Dunne

Edit approved by Andrew Dunne

Before
After
Unchanged

Step Lines

[title] Installing Fuse Panel
-[* black] Solder the 18awg red wire and 20awg black wire from the kit to the top prong on the fuse holders and heat shrink the solder joint.
+[* black] Solder the 18awg red wire and 12awg black wire from the kit to the top prong on the fuse holders and heat shrink the solder joint.
[* black] Install the Fuse Panel on the injection molded side panel between the Y and Z towers.
[* icon_caution] DO NOT LET THE SOLDERING IRON REST ON THE FUSE HOLDER TOO LONG OR YOU COULD DAMAGE IT AND NEED A REPLACEMENT!
[* black] Now solder the 20awg red wire from the hot end whip to the bottom prong on the 5A HOT END Fuse. Next solder the 12awg black bed heat wire coming out of the X tower to the bottom prong of the 15A BED HEAT fuse.
[* icon_reminder] DO NOT FORGET TO PUT YOUR HEAT SHRINK ON BEFORE YOU SOLDER TO THE FUSES.