Changes to Step #41
Step Lines
+ | [title] Wire Connections / Locations |
---|---|
+ | [* black] Install E0 TEMP (2 white wires in a 2 pin connector) connector in the location E0 TEMP position on the DUET board. |
+ | [* black] Install the HOT END FAN (1 orange wire in a 2 pin connector) connector in the FAN 2 position on the DUET board. |
+ | [* black] Install the LAYER FAN (1 orange wire in a 2 pin connector) connector in the FAN 0 position on the DUET board. |
+ | [* black] Install the LED (1 green wire in a 2 pin connector) connector in the Always On Fan position on the Duet board. |
+ | [* black] Install the PROBE Wires(red, blue, black and brown wires in a 4 pin connector) connector in the PROBE position on the Duet board. |
Image 1
No previous image
Added