-[* black] H
+[title] Whip Connections on RAMBo
+[* black] The whip connections specifically are noted below.
+[* black] You should begin by connecting the red and black 18awg wires to a 2 position terminal block (found in RAMBo kit). Note the polarity in the photo.
+[* black] Next, connect the orange wire to a 2 position terminal block (found in RAMBo kit). Note the polarity in the photo.
+[* black] Next, connect the remaining wire to the board. These connection are pre-terminated and connect to the position noted in the pic.
+[* black] Plug in the RAMBo cooling fan. The connection will be made in the bottom right hand corner of the board. This location is indicated in the third image.