Changes to Step #13
Step Lines
[title] Heated Bed Hook-Up | |
- | [* black] The heated bed wires are the ones are run through the X (front left) tower. There is a black 12awg wire and a pair of white 26awg wires. |
+ | [* black] Connect the thermistor wires that you prepped in the last step to the T2 location on the RAMBo board. |
+ | [* black] Locate a 2 position terminal block from the RAMBo kit. You will install the 12awg wire into that connector in the position indicated in the image. This is the negative position on the RAMBo board. |
+ | [* black] Connect the terminal to the RAMBo in the Heat 2 Bed position. |
+ | [* black] Secure the wire to the top assembly base plate. |
Image 1
Old Version
New Version
Image 2
Old Version
New Version