Skip to main content

Changes to Step #36

Edit by SeeMeCNC

Edit approved by SeeMeCNC

Before
After
Unchanged

Step Lines

-[* black] Insert wisdom here.
+[title] RAMBo Board Connections
+[* black] Plug the I2C wires (4 pin latching housing) into the RAMBo board in the I2C location. This connection is keyed. (shown in the image with an orange arrow)

Image 1

Old Version

New Version