Changes to Step #188
Edit by Andy Oprisko —
Edit approved by Andy Oprisko
- Before
- After
- Unchanged
Step Lines
- | [* black] Insert wisdom here. |
---|---|
+ | [* black] Approx. 7 inches from the top of the machine, you will be putting the PTFE tube inside the covering for the hotend whip. |
+ | [* black] The covering is a mesh, so you will work the PTFE tube into the mesh with the wires. |
+ | [* black] Manually lower the hotend to the center of the bed all the way down. |
+ | [* black] Work the PTFE tube through the mesh of the hotend whip and poke it out of the mesh approximately the same height as the carriages with the hotend at the bed as shown in Pic 3. |