Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #147

Edit by Andy Oprisko

Edit approved by Andy Oprisko

Before
After
Unchanged

Step Lines

-[* black] Insert wisdom here.
+[* black] Insert the wires past the wire covering into the cable hub.
+[* black] In Pic 2, you want to align the cover for the 10 pin connector on the wires to the left side of the Z tower. This will set the distance of the whip to the proper length.
+[* black] The top of the 10 pin boot should be lined up with the top of the lower frame next to the Z tower.
+[* black] Use a pair of pliers to tighten the large section of the cable hub to tighten the hub to the whip and secure it in place as shown in Pic 3.