Changes to Step #147
Edit by Andy Oprisko —
Edit approved by Andy Oprisko
- Before
- After
- Unchanged
Step Lines
- | [* black] Insert wisdom here. |
---|---|
+ | [* black] Insert the wires past the wire covering into the cable hub. |
+ | [* black] In Pic 2, you want to align the cover for the 10 pin connector on the wires to the left side of the Z tower. This will set the distance of the whip to the proper length. |
+ | [* black] The top of the 10 pin boot should be lined up with the top of the lower frame next to the Z tower. |
+ | [* black] Use a pair of pliers to tighten the large section of the cable hub to tighten the hub to the whip and secure it in place as shown in Pic 3. |