Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #5

Edit by Caleb Fairres

Edit approved by Caleb Fairres

Before
After
Unchanged

Step Lines

+[title] More Preparations
+[* black] Snip the zip tie on the short section of mesh loom exiting the X tower and remove the mesh loom. This mesh loom is only installed at the factory to prevent wire pinching during the initial machine assembly. It won't need to be re-installed after these steps if you don't wish to.
+[* black] Rotate the spool holder in the outer position.

Image 1

No previous image

Added

Image 2

No previous image

Added