-
-
Open and inspect the contents of your SE300 whip kit to ensure you have all the parts listed on the BOM.
-
-
-
Begin inserting the wires into the black SL 10 position housing.
-
Repeat for the remainder of the wires, using the diagram from earlier as a guide.
-
-
-
Pass the wires through one of the shorter lengths of mesh loom material.
-
Tightly zip tie the bundle to hold everything in place.
-
Run everything through the wider cable boot, covering the zip tie and connector.
-
-
-
Insert the two white wires in the 4 pin SL connector just as you did for the 10 pin SL connector in Step 2.
-
Make sure an adequate amount of the PVC has been stripped from the red and black 20awg wire, and insert into the 2 pin push-in wire terminal as shown.
-
-
-
Pass the cables through the mesh loom, zip-tie them secure, and install the cable boot as we did in Step 3.
-
Zip tie the two cable bundles together at the top of the mesh looms as shown.
-
-
-
Pass all the cables through the mesh loom.
-
Rout the cables and mesh loom through the loom splitter, using it to cover the joint between the three sections of mesh loom.
-
Add a zip tie to the mesh loom, just above the loom splitter, to secure it in place. See photo for reference.
-
-
-
Insert the KK connectors as shown, making sure that the small tab on the metal wire crimp is aligned with the tab hole on the plastic connector.
-
Repeat for the remaining KK connectors, carefully following the wiring diagram from earlier.
-
Cancel: I did not complete this guide.
2 other people completed this guide.